Renewable M&A for the Australian Market

Solar
BESS
Hybrid
Wind

Structured transactions across the Australian renewable energy market, connecting developers, sponsors and infrastructure investors through curated acquisition and capital opportunities.

For sponsors and developers

Distribute your project to our global investor network without committing to a broad broker mandate.

  • Curated buyer matching: investors filtered by mandate, not blasted to a wide list
  • Accelerated process: typical sell-side execution in 4-9 months depending on stage
  • Confidential and transparent: you control disclosure timing and depth

For investors

Access curated Australian pipeline matched to your mandate.

  • Filtered deal flow by state, MW range, stage and asset class
  • NDA-gated detailed packs: only see deals that fit your criteria
  • Direct sponsor connect when there is genuine fit

Asset classes

Across the NEM and WA SWIS, from greenfield development to operating assets.

Utility-scale Solar PV

Greenfield, RTB, COD and operating. Single-axis tracking systems, PPA-backed or merchant tail structures.

Standalone BESS

Including assets under CIS Tender 4+. Energy arbitrage, FCAS revenue, capacity contracts.

Hybrid (Solar + BESS)

Co-located projects with single point of connection. Increasingly common under CIS LTESA structures.

Onshore Wind

Greenfield to operating wind farms across high-resource regions. PPA-backed, CIS LTESA-eligible or merchant structures.

Live pipeline

Detailed information packs are available under NDA.

120 MWp Solar + 90 MWh BESS — NSW
Acquisition
NSW

120 MWp Solar + 90 MWh BESS

Stage: Advanced development — DA received, PPAs signed (10-year terms)

EPBC Non-Controlled Action. Grid Connection Agreement Q1 2025.

177 MWp Solar + 1,200 MWh BESS — QLD
Co-development
QLD

177 MWp Solar + 1,200 MWh BESS

Stage: Early-mid development — DEVEX funding sought, RTB target Q4 2028

Land exclusivity secured. 6.7 km 275 kV transmission route identified.

150 MWp Solar + 200 MWh BESS — VIC
Acquisition
VIC

150 MWp Solar + 200 MWh BESS

Stage: Ready-to-Build — DA approved, GCA executed, EPC contract negotiated

10-year CIS LTESA awarded under Tender 4. Target COD H2 2027.

All projects are confidential. Sponsor identity and details are disclosed under NDA only.

Why work with Alter5

0+

Global investor network

Active institutional investors with mandates across our distribution platform.

0 GW+

Renewable capacity transacted

Solar, BESS and hybrid assets distributed through our network.

A$0M+

Transactions executed

Debt and M&A deals closed by the Alter5 team across multiple markets.

Selling process

01

Submit project

Share project details and documents. We sign a mutual NDA before going deep.

Sponsors upload basic project information plus teaser, IM or technical documents. We confirm scope, structure and confidentiality terms before any external distribution.

02

Teaser distribution

We curate an anonymised teaser and distribute it to investors whose mandate fits.

Filtered by asset class, state, MW range and stage. The project reaches only the investors that match — no broad-broker blast, no noise.

03

Match and execution

On genuine fit, we facilitate direct sponsor-investor introduction and support through to close.

NDA, full information memorandum, data room access and coordination of diligence. Typical sell-side cycle: 4-9 months from mandate to close depending on stage.

Frequently asked questions

Submit project

Single-step form. Attach at least one document — teaser, information memorandum, technical spec, or financial model. We will be in touch within 48 hours AEST.

Your details

Project details

Documents *

At least one document required. Multiple files allowed — project information, teaser, IM, technical specs, financial model, etc.

Click to upload teaser/IM/data room files — or drag multiple files here

PDF, DOCX, XLSX or PPTX — up to 50 MB per file. Hold Cmd/Ctrl to select multiple.

Protected by reCAPTCHA